Wednesday, September 3, 2008

Bridge #3





A Steel girder up on lock blocks creates a bridge that will be there far longer than I likely will. We had to use lock blocks here as this has washed out before and is rather wide. The lock blocks are set into the ground 6" above high water mark and was rehabilitated very nicely by Brian. Here are a couple shots of that bridge.

No comments: